Third Day Of Framing view of long wall sheathing and window holes.  Walls are 2X6 at 16" on center.  Wooden I-Beams are a little less than 23" on center and are 16" tall.  These across this section are 24' long.
Third Day Of Framing view of Pond entry with sheathed walls.
Third Day Of Framing view of pond wall and garage entry doorway.
Third Day Of Framing view of long wall with window holes from back shed.
Third Day Of Framing view of back corner of long wall and wall that is even with the house wall.