      Progress Blog
The Layout Before Work Started Grading/Site Work Foundation Work Framing/Roofing Work HVAC Work Interior Work Flooring Work Exterior Work
   
Third Day Of Framing view of garage door opening and knee wall above garage. A 24' laminated beam was used above the garage door opening.  The space between the wooden I-beam and the laminated beam is the opening for the cantilevered deck supports to pass through.
Third Day Of Framing view of garage door and pond area from neighbor's yard.  Knee wall is @ 3 feet high.
Third Day Of Framing view of house from across the street.  Nothing to be seen here....yet.
Third Day Of Framing view of missing driveway.  Driveway is in the big blue trash can.  I managed to throw most of the driveway into the trash can in a few hours.  Concrete truck did most of the break up work for me.
Third Day Of Framing view of inside looking outside.  This sliding glass door will go away eventually.