Kick Ass Garage Dot Com
Progress Blog
The Layout
Before Work Started
Grading/Site Work
Foundation Work
Framing/Roofing Work
HVAC Work
Interior Work
Flooring Work
Exterior Work
Bon Aire 24000 BTU split system installed on 46' long wall in middle of garage.
House side HVAC vent in the large room.
House side HVAC Vents in the tunnel.
HVAC vent in wall of stairwell.
HVAC crossover ducting.
Go To Page 2