View from in front of the rear shed.
View from other side of silt fence.
36 foot long trench with rebar.
Opposite view of 46 foot long rear wall trench.
View from inside of house looking out 6 foot door.  This section of the house will "Connect" with the garage in a transition room of some sorts.  The stairs to go up will be in this area along with a door to the garage and a new 6 foot door to go out towards the fish pond.