Footings dug and rebar set....Covered by a nice blue 40
X 60 tarp. |
 |
Rebar in 46 foot long wall covered with tarp. |
 |
Rebar in corner of 36 foot long wall covered with tarp. |
 |
View of the flattened dirt from the inside of the house
after the footings concrete pour. |
 |
Footings poured for exterior walls with vertical rebar
for CMU walls. |