Footings dug and rebar set....Covered by a nice blue 40 X 60 tarp.
Rebar in 46 foot long wall covered with tarp.
Rebar in corner of 36 foot long wall covered with tarp.
View of the flattened dirt from the inside of the house after the footings concrete pour.
Footings poured for exterior walls with vertical rebar for CMU walls.

Go To Page 6