Kick Ass Garage Dot Com
Progress Blog
The Layout
Before Work Started
Grading/Site Work
Foundation Work
Framing/Roofing Work
HVAC Work
Interior Work
Flooring Work
Exterior Work
Empty bathroom.
Old toilet room doorway, it has since been filled in.
Hallway to stairwell.
Hallway framed in. Toilet room has been removed to make a small entry room at the top of the stairwell.
This whole section has been redone since these pictures were taken.
Go To Page 5