Kick Ass Garage Dot Com
Progress Blog
The Layout
Before Work Started
Grading/Site Work
Foundation Work
Framing/Roofing Work
HVAC Work
Interior Work
Flooring Work
Exterior Work
Ruud heat pump installed in the tunnel along the long wall upstairs. It is a 13 seer system, 2.5 ton.
HVAC Vent on bedroom side of large room.
HVAC vents and system in the tunnel along the long wall upstairs.
Back To Main