Connecting Room subfloor project--Two pieces of 4 X 8 tongue and groove put down.  The rest will come tomorrow.
Framing Day Ten View outside window opening opposite the deck side of the garage.  This is a double window.
Framing Day Ten View opposite of stairwell hole subfloor area.  The bathroom will be in this area.  Tub in the left corner, shower in the right corner.  Toilet in the middle.
Framing Day Ten View of finished subfloor upstairs and stairwell hole.   Back side of staircase will be attic-like storage area,  left side will be a closet.
Framing Day Ten View of the long view of the big room.  A 6' door will be at the end that opens up to the deck.
Framing Day Ten View from across the street.