Kick Ass Garage Dot Com

      Progress Blog
The Layout Before Work Started Grading/Site Work Foundation Work Framing/Roofing Work HVAC Work Interior Work Flooring Work Exterior Work
   
Framing Day Nine View from across the street.
Gutter Drain Work in the fish pond area all buried.  Pipe extensions are on to keep dirt out.
Gutter Drain Work garage door pipes are hidden now.  White pipe on the left is just to keep dirt out.
Gutter Drain Work at garage door all buried.  I used 4" PVC for the gutter drain and garage floor drain.
Gutter Drain Work behind garage showing one gutter drain and outflow pipe.

Go To Page 21