Kick Ass Garage Dot Com
Progress Blog
The Layout
Before Work Started
Grading/Site Work
Foundation Work
Framing/Roofing Work
HVAC Work
Interior Work
Flooring Work
Exterior Work
Concrete floor before polishing.
Area around fish pond before polishing.
Concrete floor after polishing.
Man polishing the floor with the machine.
Expansion joints cut into the floor.
More expansion joints.
Expansion joints at floor drain area near garage door.
Back To Main