Kick Ass Garage Dot Com
Progress Blog
The Layout
Before Work Started
Grading/Site Work
Foundation Work
Framing/Roofing Work
HVAC Work
Interior Work
Flooring Work
Exterior Work
Formed in area around garage door.
Crawlspace elevated slab created.
Far wall bracing.
Concrete Trench.
Exterior 46 foot wall backfilled.
Go To Page 12