Kick Ass Garage Dot Com

      Progress Blog
The Layout Before Work Started Grading/Site Work Foundation Work Framing/Roofing Work HVAC Work Interior Work Flooring Work Exterior Work
   
First few long rows are completed.
Build the rows on one side,  then move them to the other.
Staggered rows being made.
Opposite wall tunnel covered.  Last few rows were drilled and hand nailed into place.
Closet area floored and tunnel.  Bathroom door opening is at bottom right.  Door was changed from a double to a single for the bathroom.

Go To Page 4