Kick Ass Garage Dot Com

      Progress Blog
The Layout Before Work Started Grading/Site Work Foundation Work Framing/Roofing Work HVAC Work Interior Work Flooring Work Exterior Work
   
View of back wall from front of little shed in corner of back yard.   Hardie Board cement based siding was used on all exterior walls.
View of rear wall from back of middle yard.   The digital camera does some strange things with the horizontal lines, they are more straight than they appear.
Rear wall is covered with siding mostly.   Still a little left to do up high aroung the soffit.
More materials are delivered....More siding and upstairs flooring material.  Some of the Hardie Board was looking a little moldy,  so it was returned.  It is mostly concrete,  but not completely.
More Materials are delivered.  Flashing and some more wood.   Wood pieces are for the outside corners and the soffit/fascia areas.   Mostly trim work materials.

Go To Page 3